We were contracted to carry out a large scale outdoor graphic installation.
Prior to the production of the display graphics LDA liaised with a design agency on matters such as Health and Safety, structure design and general aesthetics of the finished project. Once all of the preliminaries had been smoothed out the graphics went into production. We produced dibond solvent graphics to cover a 40m x 4.8m high area of walling.
Two vans were then loaded and our team went off to Jersey. The project was installed over a two day period during the summer of 2008, and it was completed first time without any issues.